There's been a fair bit happening recently down in the shed.
On 45305:
All fastenings from the blast pipe and blast pipe base removed along with the removal of the blast pipe itself.
The rest of the smokebox holding down bolts were removed, as well as the back head cladding has been removed from inside the cab. This means we're almost ready to lift the boiler from the frames.
Sir Lamiel:
Since the tender was lifted off it's bogies, both bogies have now been needle gunned. Meanwhile the wheels are starting to have their first layers of undercoat applied to them.
Our shed shop will be open at the Great Central Railway's Winter Gala on the 28th & 29th January.

 

By Info | Monday, February 6, 2023 | Tags : 45305